• Home
  • Who We Work With

Who We Work With

The projects that fit our process, the ones that do not, and the limits to check before you send files.

FIT CHECK

TWO LISTS, BEFORE YOU SPEND A WEEK ON AN RFQ

Most PCB suppliers list what they can do and leave it there. This page lists the projects that fit our process as well as the ones that do not, so you can rule us in or out before spending a week on an RFQ.

Projects that fit

Your board is between 2 and 24 layers, for a prototype run or small-to-mid volume production.
You need HDI, rigid-flex, metal-based (aluminum or copper), high-Tg or halogen-free construction.
Your finished board stays within 500 x 650 mm, or within 150 x 1000 mm for long, narrow designs.
You can plan around 5-10 working days for 2-4 layers, 10-20 working days for 6-8 layers and 20-30 working days for 10 layers and above.
You want the bare board, the SMT assembly and the finished product handled by one supplier instead of three.

Projects that do not fit

Your design needs more than 24 layers for a prototype, or more than 20 layers in production. That is outside our published process limit.
Your board is larger than 500 x 650 mm.
You need Rogers or PTFE high-frequency laminates. These are not in our published material list.
You need one or two pieces delivered tomorrow. 12 to 24 hours is our fastest turnaround and it is not achievable on every order.
You are looking for a trading agent rather than a manufacturer. We build the boards in our own plant in Shajing, Shenzhen.

How to check in one minute

RequirementOur limit
Layer count, prototypeup to 24 layers
Layer count, mass productionup to 20 layers
Minimum drill diameter0.2 mm
Maximum finished board size500 x 650 mm, or 150 x 1000 mm for long boards
Finished board thickness0.15 - 6.0 mm prototype, 0.15 - 5.0 mm production
Fastest turnaround12-24 hours
Base materialsFR4, halogen-free, aluminum-based, high-Tg, copper-based
PROCESS

WHAT HAPPENS WHEN YOU SEND FILES

1. Send the files

Gerber, stack-up and surface-finish requirements, plus a BOM in Excel if you also want assembly.

2. DFM review

CAM engineers check the layout against the limits on this page and flag anything outside them.

3. Quotation

You receive a price and the lead time for your layer count and quantity, not a range.

4. Build and test

Fabrication, assembly and final test run in the same plant, so there is no hand-off between suppliers.
NEXT STEP

CHECK A DESIGN BEFORE IT GOES OUT

Send Gerbers and a stack-up. You get a DFM answer and a quotation with the lead time for your layer count.